Built for construction

Your site already tells the whole story. Now it's written down.

Press record at a site meeting, an inspection or a toolbox talk. Within minutes you get shorthand action items and a one-line summary, the work goes in the calendar with reminders set, and anything nobody in the room could answer gets chased up and checked.

Get a demo See how it works
SCHEDULES THE WORK SETS THE REMINDERS CHASES THE ANSWERS
Grown here

A New Zealand company. New Zealand builders are already running it on their sites.

app.vizfield.com/riverside/wall
Projects
Riverside · Stage 2
Halswell Road
Lincoln industrial
MS Mike Sullivan
Today · Friday 26 AUG
Joinery delay → Monday framing start at risk
From Tuesday's site meeting · programme flagged
Toolbox talk 7:02 am12 min
Scaffold moves to level 3 before Wednesday's pour · concrete booked 10:30 · 2 new starters to James
Open →
JNRYMike — install joinery Thu, double crew, done FriCURRENT
v3 · Thursday install, double crew, done FridayTue 2:45 pm▶
v2 · rain delay, materials on holdTue 2:22 pm▶
v1 · supplier confirmed WednesdayLast Thu 7:26 am▶
Site meeting · subbie catch-up Tue 2:14 pm41 min
Joinery pushed to Thursday · scaffold handover signed · variation raised on the retaining wall
Open →
After the meeting TUE SITE MEETING · 41 MIN · CLOSED 2:55 PM

Nobody asked for any of this. It was done by the time the meeting broke up.

BOOKED IN
Concrete pour · Wed 10:30 truck slotFROM 12:04
Scaffold handover inspection · Thu 2:00 pmFROM 18:52
Joinery install · Thu, double crewFROM 31:05

Added to the Riverside calendar. Attendees invited from the meeting, not from a contact list.

CHASING
Mike — supplier confirmation in writingWED 7:00
Aroha — PO raised before ThursdayDAILY 7:00
Dave — level 3 edge protection sign-offTHU 6:45

Reminders keep going until the item is closed, then stop on their own.

THE QUESTION NOBODY COULD ANSWER

"Pretty sure there's an NZS clause on cover to reinforcement for a slab in this exposure. I'd have to go and look it up."

KEN WARD · ENGINEER · TUE 2:40 PM

VizField went and looked. The relevant standard is NZS 3101, which sets minimum cover to reinforcement by exposure classification. Riverside's slab is specified B2, which points to the 40 mm cover figure, the same number already written on drawing S-104.

Tue 2:40 pm · site meeting S-104
⚠ Not said in the meeting. Found by VizField from published standards material and your drawing set, and sent to Ken to confirm. Check it against the project specification before you build to it.
JNRY-014 Install joinery · Riverside Stage 2 CURRENT
JNRYMike — install joinery Thu, double crew, done FriCURRENT
v3 · Thursday install, double crew, done FridayTue 2:45 pm▶
v2 · rain delay, materials on holdTue 2:22 pm▶
v1 · supplier confirmed WednesdayLast Thu 7:26 am▶
Recording moment · Tue site meeting
Mike Sullivan Aroha Ngata Dave Klaassen
31:05  Aroha — "Supplier can do Thursday if we put a double crew on it, so we'd be done Friday."
VizField RIVERSIDE · FRI 26 AUG

Toolbox talk, 7:02 am: scaffold moves to level 3 before Wednesday's pour, concrete booked 10:30.

SCAFDave — shift scaffold to level 3 before Wed pour
CONCAroha — confirm 10:30 truck slot with supplier today
CREWJames — take the two new starters through induction this morning
Open the full record
Sent to the Riverside project team. Transcript and recording moments stay behind the link, visible only to the meeting attendees and the project team.
Programme · Riverside Stage 2 WEEK 14 OF 32
Site establishment
Foundations
Framing
Joinery⚑ delayed · Tue 2:45 pm site meeting
Claddingunconfirmed · no meeting source
Interior fit-out
Nobody typed the joinery flag in. Someone said it in Tuesday's meeting, and the bar carries the moment it was said as its source.

It's not a note-taker for meetings. It's a record of the job.

Press record wherever the decisions actually get made. Most of what matters on a site is never in a calendar invite.

Site meetings Site inspections Client walk-throughs Subbie catch-ups Consultant reviews Toolbox talks Day-to-day on the tools

How it works

Wear it. That's the job.

Clip it on and get on with the day. One press starts the recording and one press ends it. No fiddling in between, no screens to manage, and the buttons work fine with gloves on.

WEAR IT

Take it to the meeting

On the vest for the toolbox talk, on the table for the sit-down, in your pocket between them. Press record once. The red light tells the room, and then you forget it's there.

BACKGROUND

Everything else is automatic

Footage uploads itself. Transcription and the meeting record are processed in the background while you work. Nothing to sync, nothing to export, nothing to remember.

PRESS STOP

The clock starts

Draft items are on your phone within a couple of minutes, while everyone is still standing there. Read them out, fix what's wrong, confirm. The email goes out and the record is sealed.

RECORDING STOPPED · 7:14 AM
7:14 am You press stop on the recorder.
7:16 am Draft items appear on your phone, owner first.
7:17 am You read them out. Dave's date is wrong; you tap it and fix it.
7:18 am Confirmed. The email goes out and the record is sealed.
Confirmed by Mike Sullivan on site · attendees notified

The version chain

The plan changed three times. All three are still on the record.

When Tuesday's plan changes on Thursday, VizField doesn't leave you a duplicate to reconcile. It updates the item and keeps every version, each one linked to the moment in the recording where it was said. When a variation or EOT claim comes up, that chain is your evidence, not a memory contest.

JNRY-014 Install joinery · Riverside Stage 2 3 VERSIONS
v3
Mike — install joinery Thu, double crew, done FriCURRENT
▶Tue 2:45 pm · site meeting· AROHA NGATA
v2
Joinery on hold — rain forecast, materials staying in the containerSUPERSEDED
▶Tue 2:22 pm · site meeting· DAVE KLAASSEN
v1
Joinery install Wednesday, supplier confirmedSUPERSEDED
▶Last Thu 7:26 am · toolbox talk· MIKE SULLIVAN
NOTHING OVERWRITTEN

Superseded versions stay visible and muted. They are never struck through, never hidden, never deleted.

EVERY VERSION HAS A SOURCE

Each one carries the meeting and the timecode it came from. Press play and hear it said.

SEALED FOR THE DISPUTE WINDOW

The chain and its recordings are preserved for as long as the claim window runs on that project.

Construction intelligence

It answers the question, then tells you what comes next.

Ask anything across every meeting on the job and get a straight answer with citations that jump to the moment it was said. Then it goes a step further: a date that has moved gets followed through to the trades behind it, and a claim made in the room gets checked against the supplier, the standard or the consent. Findings are always shown with their source, and always kept separate from what was actually said.

When is the joinery actually arriving?

Thursday. Aroha confirmed the supplier can deliver Thursday if a double crew goes on it, finishing Friday. That superseded the Wednesday date agreed the week before.

WHAT THAT MEANS FOR YOU

A Friday finish leaves no float before the Monday framing start, and the scaffold handover is booked Thursday afternoon on the same elevation. Worth deciding now which one moves.

Tue 2:45 pm · site meeting Last Thu 7:26 am · toolbox talk
⚠ Web check: the supplier's site currently lists a 2-day dispatch backlog. Source: supplier website, checked today. This was not said in the meeting.

Getting it to people

One button for your team. Familiar paperwork for everyone else.

Nothing leaves the meeting until you send it. Inside your company it is one tap and everyone is looking at the same record. Outside, it comes out as the paperwork your client, head contractor and consultants already read.

INSIDE YOUR COMPANY

Push it to the team

One button syncs the meeting to everyone on the project. It lands on their site wall with the items, the minutes and the recording moments, so the people who weren't there can see what happened, and search across every meeting on the job when they need to find it again.

Toolbox talk · Fri 7:02 am Share with project team
ANAroha Ngata ON THEIR WALL
DKDave Klaassen ON THEIR WALL
JTJames Tipene ON THEIR WALL
Search every meeting on Riverside
OUTSIDE YOUR COMPANY

The paperwork they already expect

No new tool for the client to learn and no link for them to lose. The meeting comes out as a site report, a plain email, or a draft ready to paste into the system they already run.

PDFSite report in your company templateDownload
EMAILStructured items: owner, due date, statusSend
PROCOREDraft RFI from the minutesDraft

Every export names its source meeting and the date it was recorded.

Subscription

Choose your subscription

Start on your own, run a whole site, or put it across the company. Viewing accounts are free on every plan.

PILOT

One site, four weeks

Everything switched on, on one real job. We check in every week to hear how it lands.

✓Full platform, programme included
✓One recording position
✓Free viewing accounts
✓Answers with sources
✓Weekly check-in with us
INDIVIDUALNZ$99 / MONTH

For one set of hands

Turn site meetings, inspections, workshops and your own debriefs into clear documents and insights. The platform does more than summarise: it chases the answers you did not have on the day.

✓30 recording hours a month
✓One recording account, one viewing account
✓Clear documents and insights from every recording
✓Answers chased, not just summaries
✓Priority chat and email support
COMPANY

Every site you run

One screen above the sites, and a service we shape around how your company actually works.

✓Everything in Ongoing
✓Portfolio view of every job
✓Custom service, built to what you need
✓Volume pricing and single sign-on
✓Named contact, not a queue

See it on your own site.

We come to one of your sites, record a real meeting alongside you, and have the write-up in front of the crew the same morning. Then you look at what actually came out of it: the items, the summary, the record behind them. Then you decide from there.

Get a demo